Specifications include, but are not limited to: Project consists of installation of approximately two-thousand linear feet of underground stormwater pipe, associated inlet, and junction structures along McGee, Hampton, and Seminole. Construction includes new concrete sidewalks and driveway aprons, as well as City Utilities gas and water relocations and renewals within the general project area along Seminole, Hampton, and McGee. Clearing & Grubbing 1 LS; Embankment (Plan Quantity) 100 CY; Misc. Removals 1 LS; Saddle Tap for Connecting Lateral to Sewer Main 3 EA; Saddle Tap for Connecting Lateral to Sewer Main 1 EA; PVC Lateral Pipe (4-inch) 188 LF; Sanitary Cleanout riser (4-inch) 4 EA; Permanent Pavement Replacement (ST-13) 217 SY