Specifications include, but are not limited to: Water Distribution System Collector to serve Courtyards at the Moorings Addition tied with Water Distribution System Phase 1 to serve Courtyards at the Moorings Addition tied with Storm Water Drain #494 Improvements to serve Courtyards at the Moorings Addition tied with Sanitary Sewer Improvements Phase 1 to serve Courtyards at the Moorings Addition tied with Street & Stormwater Improvements Part A to serve Courtyards at the Moorings Addition tied with Street & Stormwater Improvements Phase 1 to serve Courtyards at the Moorings Addition ; The Contractor shall replace all water services that are connected to the water mains being replaced. The Contractor shall be paid for the actual number of services installed at the unit price bid for the appropriate water service bid item. Water service tables shall be included in the project plan set. The tables are to be completed by the project Inspector as services are replaced. The Contractor shall provide all information necessary to complete the tables. All water services found as 1” or smaller shall be replaced using 1” service materials, unless otherwise directed by the plans. The Contractor shall provide all materials for the water service replacement bid item, including: installation of the 1” service saddle, 1” service tubing as necessary, 1” meter setter, meter box, ring, and lid.