Specifications include, but are not limited to: Demolition shall consist of removal of walls, ceilings, doors, flooring, casework and removal of MEP infrastructure. (3) Architectural work shall consist of new metal stud and gypsum board partitions, doors, frames and hardware, lay-in & gyp. board ceilings, casework and finishes. (4) Mechanical scope of work shall consist of new branch ductwork, pressure independent air terminal box with hot water heating coil, air devices, and DDC controls. The existing ductwork, air terminal units, controls and hydronic piping will be reused to the greatest extent possible. (5) Plumbing and Fire Protection scope of work shall consist of new domestic water and sanitary/vent piping, plumbing fixtures, roof drains, domestic water heaters, and sprinkler heads.