Specifications include, but are not limited to: The scope of work includes construction of repairs to the gravity thickener tank masonry façade. The CONTRACTOR shall furnish all superintendence, labor, services, materials, equipment, plant, machinery, apparatus, appliances, tools, supplies, bailing, shoring, removal, and all other things necessary to do all work required for the completion of each item of the Work; The Contractor shall, at its own expense, handle and haul all materials furnished by it and shall remove any of its surplus materials at the completion of the work. The Contractor shall provide suitable and adequate storage for equipment and materials furnished by it that are liable to injury and shall be responsible for any loss of or damage to any equipment or materials by theft, breakage, or otherwise. Unless permission to close the street is received in writing from the proper authority, all materials and equipment shall be placed so that vehicular and pedestrian traffic may be safely maintained at all times. All existing buildings, utilities, pipes, poles, wires fences, curbs, property line markers and other structures which the Engineer decides must be preserved in place without being temporarily or permanently relocated, shall be carefully supported and protected from damage by the contractor. Should such property be damaged, it shall be restored by the Contractor, at no additional cost to the Owner.