Specifications include, but are not limited to: Contractor shall furnish all personnel and equipment required to test, calibrate and coordinate protective relays. Test values shall be provided by Owner to Contractor for performing end-to-end line protection and coordination testing with test set. Creation and execution of testing plan(s) will be the responsibility of the Contractor. Provide NETA certified technician(s) to perform testing and commissioning of the below listed equipment in reference to the ANSI/NETA ATS-2021 Acceptance Testing Specifications for Electrical Power Equipment and Systems (or later). List of equipment and devices to be tested: Qty: 2 ea. SEL 411L 69kV Primary Line Relays; Qty: 2 ea. SEL 421 69kV Secondary Line Relays; Qty: 2 ea. Existing SEL 411L Firmware Upgrades (Discs Provided by Owner); Qty: 1 lot. Wiring Verification; Qty: 1 lot. DC Control Circuitry (Control Checkout); Qty: 1 lot. Trip Checks / Alarm Checkout; Qty: 1 lot. SCADA Checks (to be completed with assistance of Owner); Qty: 1 lot. Energization Checks (to be completed with assistance of Owner);