Specifications include, but are not limited to: mobilization and demobilization to site, establish maintenance of traffic, establish sediment and erosion controls, survey and layout of site, installation of the following: approximately 1,436 linear feet of 8-inch (8”) DR 18 PVC water main, 1 - eight inch (8”) gate valves, 44 – one inch (1”) SDR9 poly tubing water services, 44 new meters, 6 meter pits, capping and abandonment of existing water pipe and removal and abandonment of inactive sewer services. A. The work to be done is covered in the Construction Documents (Drawings) titled West Street East Alley Water Main Replacement and in the project technical specifications titled West Street East Alley Water Main Replacement, section 01 11 00 Summary of Work. B. All implements, machinery, tools, maintenance of traffic (traffic control), equipment, material, shall be provided by the contractor, including the labor necessary for the installation of the new water main and abandonment of existing piping, and shall furnish and do everything necessary to make the work perfect, complete, neat and finished, and the Contractor shall leave all the work to be done under this Contract in this condition at the time the work is finally inspected.