Specifications include, but are not limited to: Allen Elementary School Renovation Scope • New paint throughout • New ceramic or porcelain wall tile at restrooms • Removal of folding walls – replace with metal stud insulated walls • Remove VCT replace with LVT throughout • Remove ceramic tile floors at restroom, install porcelain tile • Quarry tile in kitchen • New 2 x 2 SAC throughout • LED light fixtures throughout • New HVAC registers and grilles • Fire alarm system • New visual display boards, tack boards, tack strips and monitor brackets • New casework and sinks in classrooms • Renovated/modified restrooms in classrooms to meet ADA • Demo of portion of existing walls • New quarry tile flooring in kitchen • Data communication, cabling, access control, cameras • Various campus improvements Allen Elementary School Addition Scope • 12,000 SF single story addition, suspended slab, structural steel framework and masonry to match existing building. • To include 4 classrooms with restrooms, 1 lab with storage, enlarged cafeteria with new stage, collaboration areas, custodial and electrical. • Existing 2,700 SF Art/Music bulding will be incorporated into new addition. Renovation of this building to include new ceilings and lighting, new casework, paint and new flooring, new roof and HVAC. • Concrete driveway and parking with (3) aluminum canopies, site lighting, and new marquee.