Specifications include, but are not limited to: The City of Burlington (City) is seeking bids to provide construction services to test the viability of an open loop geothermal system to facilitate converting Fletcher Free library from a conventional HVAC system to a ground-sourced heat pump HVAC system. The test well will be at Fletcher Free Library, located at 235 College St. Our goal is to have this completed as soon as possible, while working together with Fletcher Free Library and contractor for efficiency. a. Inclusion of all work for a complete project in your proposal; b. Obtaining building permit for work to be performed; c. Mobilization and demobilization; d. Preparation of the work site including existing utilities location; e. Provision for fluid/solids containment inside the work zone; f. Maintenance of a secure site at all times; and g. Clean up/Site restoration to pre-existing conditions. h. Work must be affectively coordinated with current park construction to include City Senior Engineer, City Project Coordinator, and Park Contractor.