Specifications include, but are not limited to: Certain operations regarding construction of this project will require shutdowns or disruptions of water service. For the purposes of bidding on this contract, the Contractor should be aware that these operations and shutdowns shall be coordinated with all affected customers and may require nighttime or after-hours construction. For the purposes of bidding on this project the Contractor shall assume that ALL commercial service reconstructions will be done through after-hours or nighttime construction. The Contractor shall coordinate all service disruptions or shut-downs with affected homeowners or businesses and the Lincoln Water System prior to performing work. Pavement and water main removal and replacement for the purposes of installing Cured InPlace-Pipe Lining is shown on the plans for information purposes only. The Contractor shall submit a detailed work plan for approval to the Owner, as well as all submittals identified in the Cured-in-Place Pipe (CIPP) Watermain Lining Specifications, prior to mobilizing to the site. The work plan shall include, but not be limited to, pavement removal and replacement, water main removal, replacement, and reconnection, isolation and reconnection to branch and service connections, disinfection and testing, and any other work required to install the pipe lining and place the system back in service. The Record Drawings for the existing mains are included as an Appendix 1 to these special provisions. The Contractor shall not mobilize to the site until a Work Plan has been submitted and approved by the Owner.