Specifications include, but are not limited to: Part 1 Project Base Scope of Work: • DP Road Phase II: Roadway infrastructure and drainage improvements to include removal of existing asphalt surfaces and base material. Re-compaction of subgrade and base material and installation of new asphalt surface. Construction of driveways, sidewalks, curb ramps, and curb and gutters will be completed. Existing streetlighting will be relocated and upgraded with new conduit, arms and fixtures. New storm drain installation to include drop inlets, manholes, median drop inlets, and pond infrastructure. (Roadway Reconstruction: Approx. 2450 feet). • Utilities infrastructure includes installation of a gravity feed Sewer Line and an 8-inch force main sewer line. New lift station and sewer manholes. Replacement of the water (12-inch) and HDPE gas lines (4-inch). Reconnection of services to adjacent properties. Install conduit for electrical power, County fiber, Century Link/Lumen and Comcast. Part 2 Work Sequence A. The Contractor shall prepare and submit for the Owners approval a work sequence plan. Once approved, the contractor shall execute the plan, and resubmit for the owner’s approval any revisions needed to this plan. B. Contractor shall test all materials, parts and equipment installed as part of this project; start up the system, before turning it to the Owner for beneficial occupancy. Part 3 Incidental Work A. Contractor shall provide, as part of the contract price, all labor, superintendence, machinery, equipment, supplies, temporary utility services, third party compliance testing and analysis, necessary to complete the various items of work in accordance with these contract documents, to provide a complete, functional, and ready-to-use installation. B. Contractor shall, as part of the contract price, acquire all necessary approvals for access to all project sites.