Specifications include, but are not limited to: Consultant shall create the WTMP via the Tasks defined in this document. The scope of work for the effort includes the following areas: TASK A – Project Visioning TASK B – Transportation Study TASK C – Waterfront Reconstruction Study TASK D – Master Plan, Concept Development, and Estimates TASK E – Project Management TASK F – Administrative Record The consultant shall coordinate with ARRC to develop the Master Plan. As there are overlaps, links and dependencies between several of the defined Tasks, the consultant is required to coordinate work among teams in order to clarify these links and dependencies, avoid duplication of efforts, provide input to support tasks outside their main responsibility and drive consistency between the different tasks and related documents. Each deliverable shall be ready for inclusion in future permitting documents. For example, the contents of the Environmental Assessment or Impact Statement should be lifted directly from Final Reports and Studies. The consultant shall maintain a consistent level of writing that requires little to no editing for in-future documentation.