All correspondence must be made through the Vendor Portal. Specifications include, but are not limited to: This project consists of concrete repairs, asphalt milling & overlay, and bridge repair. All utility work has been completed or the necessary arrangements have been made for the required utility work to be undertaken and completed as required for proper coordination with the physical construction schedules. The Contractor shall use waterblasting equipment operated with sufficient consistent pressure to effectively clean the pavement surface of all dirt, foreign materials, loose surfacing material, and any residue before placement of the asphaltic concrete overlay. Care shall be taken to prevent any debris or construction materials from directly entering, or entering any inlets on the project that lead directly to: 1. waterways. 2. poorly-vegetated ditches, or 3. Well-vegetated ditches having less than 200 feet between the conduit outlet and the point of discharge of the ditch into a waterway.Inlets shall not be blocked or otherwise restricted in such a way to cause water to collect within an active traffic lane.