Specifications include, but are not limited to: It shall be the responsibility of the Contractor to protect existing structures from damage which might occur during construction. The Contractor shall replace or repair, as directed by the Engineer, any structures damaged by the Contractor during the life of the contract. No payment will be made for replacement or repair of damaged items. During construction, care shall be exercised to ensure that no debris falls into the hydraulic crossing below the structures. All debris, including any material that has accumulated on the bridge caps, shall become the property of the Contractor and shall be removed from the construction site. Work on the project shall consist of the following repairs to bridge number 48.2A (10066) and bridge number 48.2B (10067) located on US 72 over Hatchie Creek in Alcorn County. • Remove and replace bearings at specified locations in accordance with the Standard Drawings. • Remove and replace all joint seals at the open joints. • Repair spall locations with epoxy mortar. • Clean all caps