All correspondence must be made through the Vendor Portal. Specifications include, but are not limited to: The Work to be included in the Construction Contract (“Project”) is generally described as replacing the existing carpet and cove base in the main offices, workstations, and conference room in the Driver’s License Building on Benjamin Lane due to the age of the carpet; • The Contractor shall be responsible for ensuring correct measurements of areas to be completed. • Ada County dumpsters are not to be used for disposal of carpet. • Provide all material and labor for the removal of existing carpeting and base and reinstalling with new carpet tiles, etc. as specified above. Onsite storage of materials TBD. • Carpet is to be laid in a quarter turn pattern. • All furniture which cannot be easily moved will need to be raised by the contractor and have carpet laid underneath it. For example, large desks or cubicles. • Contractor will be responsible for disposing of all waste materials. All waste must be removed from the area each day. • All areas with adhesive laid down will be covered before leaving the work area. • The contractor will ensure that all areas are available for employees use during regular working hours.