Specifications include, but are not limited to: This project consists of Sidewalk improvements at three locations within the City limits. Area 1 consists of construction of new concrete sidewalks on Winchester Street and Suzanne Drive and installation of new Pedestrian Crossing of Ocean Road. This Area work will require an approved easement as well as NHDOT approval and permits prior to beginning work. Area 2 consists of construction of new concrete sidewalks in the Pannaway Manor neighborhood. The old asphalt sidewalks on both sides shall be removed, new concrete on one side and the other side restored with loam. 26 large trees will be removed prior to beginning sidewalk work. Area 3 consists of replacing an existing concrete and asphalt sidewalk along Greenland Road and Sherburne Avenue with a new concrete sidewalk. A revised sidewalk layout on Greenland Road to provide relocated roadway crosswalks to connect to the pedestrian path leading down Greenland Road. The scope of work shall include installation of curbing, excavation to sub-grade, placement of select base materials, construction of new sidewalks, driveway reconstruction as necessary, and other ancillary tasks.