Specifications include, but are not limited to: Furnish all transportation, equipment, labor, materials, and tools required to perform the work as set forth in the scope of work and/or any documents called for to prepare the project. Provide A & E stamped drawings to the level required to perform the work called for in the scope of work and to the level required to obtain building permits, if drawings not provided by owner. Provide skilled supervision and workmen to perform the work required for successful completion and acceptance of the project. All new work shall be performed to the highest industry standards for the type of work being performed. Comply with all local, state and federal laws governing safety, health and sanitation. Contractors shall provide all essential/needed safeguards, safety devices and protective equipment; take any action necessary to protect the life and health of employees on the job; and to protect the property of the State in connection with the performance of the work covered by this Price Agreement. Provide the workmen adequate insurance, including, but not limited to Workers’ Compensation Insurance. Make all arrangements for the storage of its tools, equipment, and materials needed and required to perform the work. Restore any damage to existing, adjacent finishes to their original condition, and to make new work inconspicuous with the existing, adjacent finishes. Be responsible for the clean-up of all work areas, adjacent areas and the proper disposal of all construction debris in an approved landfill. Existing on-site trash containers shall not be used for the disposal of the Contractor's construction debris. Purchase all necessary and appropriate material at the best price attainable. Contractors must attach to the invoice for payment the original invoices for materials incorporated into the project. Provide a written, itemized (labor, subcontractors, materials mobilization) quote within fifteen (15) days of receiving a detailed scope of work or drawings for each said project. Quote shall include all the costs of the work to be performed, the amount of time required for the completion of the project and any exceptions or alternatives to the scope of work and be submitted to the using agency at no cost to the State. Not begin any work until receiving a Notice to Proceed from the contracting officer of the using agency requesting this work. Respond to NMDOT’s request for emergency services within four (4) hours of receipt of the request. Contractors shall have experience in all areas of the work set forth in this Invitation to Bid.