Specifications include, but are not limited to: The Scope of Work for this contract includes furnishing all labor and material required to complete the project. This includes coordination with City utility for installation of new water service and electrical service. The work also includes erosion control measures necessary to protect sidewalks and stormwater infrastructure, grading of the site, and haul off excess fill material. Site improvements in the scope of work include earthwork berms, concrete pavement, site furnishings, irrigation, and electrical work. Also included in the scope is soil preparation, planting beds, and trees. Seeding shall be performed by the City after fine grading and soil preparation is completed by Contractor. A second Bid Package for Park improvements will be released late winter/early Spring. This is anticipated to include a restroom/concession building, concrete plaza/walks, shade structures, landscape/irrigation, and playground on the western portion of the park.