Specifications include, but are not limited to: THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 9.554 MILES OF HIGHWAY 79 IN CRITTENDEN COUNTY AND 6.384 MILES OF HIGHWAY 79 IN ST. FRANCIS COUNTY. THIS PROJECT CONSISTS OF REMOVAL AND DISPOSAL OF GUARDRAIL, AGGREGATE BASE COURSE, ACHM SURFACE COURSE, MAINTENANCE OF TRAFFIC, GUARDRAIL, EROSION CONTROL, RUMPLE STRIPS AND STRIPES, PAVEMENT MARKING, AND MISC. ITEMS. COUNTY: CRITTENDEN & ST. FRANCIS; LENGTH: 15.938 miles in length. R&D OF GUARDRAIL 550.00 LF; AGGR.BASE COURSE(CLASS 7) 1,683.00 TON; TACK COAT 63,245.00 GAL; MA IN ACHM SURFACE(1/2") 39,406.00 TON; AB(PG64-22)ACHM SURF(1/2") 2,162.00 TON; COLD MILLING ASPHALT PVMT. 3,400.00 SQYD; ACHM PATCH.EXIST.RDWY. 140.00 TON; MOBILIZATION 1.00 L.S.; MAINTENANCE OF TRAFFIC 1.00 L.S.; SIGNS 810.00 SQFT