Specifications include, but are not limited to: The renovation of the existing toilet rooms in the Student Center (SC) as identified in the Contract Documents. The work includes the removal of toilet fixtures (to be reinstalled), toilet partitions, wall tile and substrate to the stud framing. The new construction will include the replacement or repair to damaged wall framing construction, installation of blocking for the anchorage of new toilet partitions and toilet accessories, wall tile with wall board, flooring, repair to drywall ceiling, installation of new lighting, and painting. The plumbing, mechanical, and electrical work includes the connection of the toilet fixtures, light fixtures and relocation of grilles.