Specifications include, but are not limited to: The Contractor will be allowed a total closure of the street until Work is substantially completed; however, local access to homes and businesses must be maintained whenever possible. Any restrictions to access shall be coordinated with the City’s Project Manager and property owners. Access for emergency vehicles and businesses shall be maintained at all times. After milling operations are complete, the Contractor will assume all costs associated with maintaining the milled surface and assumes responsibility for any damages to the driving surface. The Contractor shall coordinate their work on this project and the development of their project schedule with other public or private projects in the area that may be underway concurrently with this project. The Contractor shall locate, flag, and protect, existing lawn sprinkler systems located within the project area. This work shall not be paid for directly and shall be considered subsidiary to other items for which direct payment is made. When a lawn sprinkler system is damaged due to negligence by the Contractor, it shall be repaired at the expense of the Contractor. No trees have been identified for removal on this project. The Contractor shall protect all trees that are not required to be removed in this project. Where necessary, the Contractor may have to hand dig around trees to prevent damage to roots. Replacement of sanitary sewer manhole adjusting rings, frame and cover shall be measured and paid for at the contract unit price per each for REPLACE SANITARY SEWER MH RINGS, FRAME AND COVER. This price shall be full compensation for removal of the existing manhole rings, frame and cover and replacement of manhole adjusting rings, frame and cover as well as all labor, tools, equipment, materials, and incidentals necessary to install these items.