Specifications include, but are not limited to: The Contractor shall provide professional design services to resurface the existing pavement that may include as necessary: roadside hardware, drainage improvements, ADA improvements, safety improvements, bridge repairs, and utility relocations. Activities include: Surveying/ROW Mapping, Public Involvement, Erosion & Sediment Control Plan (ESCP), Plans, Specifications, & Estimates (PSE), and Design Analyses & Reports (DAR), Project Closeout, Assistance During Bidding, and Assistance During Construction. The Contracting Agency may add up to two (2) similar pavement preservation projects during the initial period of performance [see 15 – Special Notices, Note #15.8].