Specifications include, but are not limited to: The Power – N& S project is in Teton County on Interstate 15 (I-15) beginning at RP 301.4, the Cascade/Teton County line, and continuing north 7.8 miles to RP 309.2, approximately 3 miles south of the Dutton Interchange. Mainline will be milled and overlayed full width and new shoulder rumble strips will be cut. The Power Interchange ramps and crossroad will be crack sealed. Everything will be chip sealed. INVOLVING MISCELLANEOUS WORK 15,000 UNIT; STRUCTURE ANALYSIS 1 LS; MOBILIZATION 1 LS; BMP ADMINISTRATION-LS 1 LS; TEMPORARY EROSION CONTROL-FIXED 500 UNIT; TEST TRAILER-TRANSPORT,SETUP 46 MILE; PLANT MIX SURF GR S-3/4 IN 45,242 TON; HYDRATED LIME 633 TON; ASPHALT CEMENT PG 70-28 2,266.4 TON