Specifications include, but are not limited to: The Northwest Arctic Borough is seeking a contractor to, design, procure and install two (2) new boilers, consisting of one (1) primary and (1) backup boiler, and replacement of the glycol lines at the Northwest Artic Borough offices at 163 Lagoon Street, Kotzebue, AK 99752. The current configuration consists of: • One (1) Burnham V07 Series oil-fired boiler providing baseboard heat to the main office • One (1) Toyo HC-20 hydronic unit in the reception office • One (1) Modine HS 165S01 hydronic unit in the garage The office building is 6,166 total square feet. The first story consists of twelve (12) Offices, Assembly Chambers, Lobby, two (2) hallways, Breakroom, two (2) Restrooms, and a two-(2) car garage. The second story consists of five (5) Offices, one (1) Walk-in closet, one (1) Hallway, and (1) Restroom. Contractor is responsible for removal of the existing boiler, but the Northwest Arctic Borough will dispose of the unit. Contractor is responsible for providing all equipment and labor in addition to lodging, logistics, and airfare related to the work. Work will be performed on a reimbursement of equipment and labor basis with a maximum price not to exceed dollar amount designated by the Contractor.