Specifications include, but are not limited to: The Contractor shall provide induced draft, crossflow, double flow cooling tower as manufactured by SPX Cooling Technologies with approved alternates being EVAPCO or B.A.C. or an approved alternate with final approval from the ADH. Number of tower fan cells must be two (2). 1. Cooling tower physical size envelope is limited to 60’ x 73’ with a wall on one each of the short and long sides. Tower must fit into the envelope, including clearances. 2. Tower must be guaranteed to meet minimum requirement of 3000 GPM of water cooled from 95F to 85F at 80F design wet bulb temperature. Cooling tower performance must be CTI certified. Tower must be selected to operate at maximum sound levels not to exceed 80 dBA at 5’ from an air inlet face all cells operating full speed as tested by CTI guidelines. Certified sound test reports must be included with submittal. Attenuation to be factory installed at air inlets to meet specified limits.