Specifications include, but are not limited to: )Set-up safety per OSHA requirements prior to beginning work.2)Remove all ballast by vacuum method.3)Remove existing EPDM membrane and membrane flashings. Properly dispose.4)Install ½” HD ISO cover board over entire roof.5)Install a mechanically fastened 060 EPDM membrane roof system.6)New .060 EPDM flashings on all walls, curbs, pipes, and other penetrations.7)Reuse existing clamping rings if in good condition. If not, install new clamping rings.8)Install (2) EPDM walkway pads at the roof hatch, the bottom and top of the ladder to the upperroof, and at each serviceable side of the HVAC units.9)Install Bilco 2.0 f safety rail at existing roof hatch.10)Shop form and install 24-gauge Kynar coated metal edge at roof perimeters.