Specifications include, but are not limited to: 1. Acquire a construction proposal detailing crewing, equipment, logistics and supervising capabilities of the contractor to achieve desired pacing, design and engineering plans set forth by DVFiber for this build. 2. Obtain a price book for fixed pricing of construction and make ready line items including time and equipment billable with description of work. 3. Assess the contractor’s ability to supply all necessary OSP/ISP hardware and materials for construction and make ready needs that meet or exceed relevant industry standards and best practices. Include a cost plus sheet for OSP equipment and hardware supplied by Contractor. 4. Assess the respondent’s ability to provide necessary management structure to allow precise coordination of construction and make ready operation as needed and desired by DVFiber/GWI engineering teams. 5. Assess the respondent’s ability to provide accurate and timely as-built reporting on work completed within negotiated turn around time frames within owner supplied digital platforms. 6. Assess the respondent’s ability to implement, use and be accountable for any type of field work management software that the owner provides that can be used mobilely in the field by crews and management to track progress and help generate billing. (Examples Ocius X, Vetro) 7. Determine whether the respondent is currently qualified or able to be qualified to do OTMR for all attachees in the telecom space and coordinate communication of MR work with them (including but not limited to Consolidated Communication, Comcast, First Light, Vtel). 8. Determine the respondent’s capability to provide a knowledgeable and reliable asset to conduct pole application ride out (RO) surveys with pole owners while representing the owner and all existing & authorized telecom plant.