Specifications include, but are not limited to: Are conflicts with this facility anticipated? NO Description of existing location(s) and facility type: Electrical line runs parallel to I-80 and feeds the existing rest area on the south side. Existing Rest Area – Underground 7.2kV providing service to existing structure Description of conflict(s) with NDOT project: Two poles and the associated wire were encroaching upon the limits of construction near the rest area, associated with the I-80 mainline project. Existing Rest Area location – underground feed to the rest area conflicted with anticipated construction activities Relocation Work and Schedule: High West Energy relocated their facilities at this location to outside of the limits of construction, in June 2022. Existing Rest Area location - High West Energy de-energized the underground portion of the line that is within the limits of construction. New facilities will be installed to provide service to the new rest area. Additional coordination with NDOT Contractor: N/A Contact Information Tim Theobald, Staff Engineer, 307-245-4343, ttheobald@highwestenergy.com