Specifications include, but are not limited to: The City will arrange for the disconnection of utility service connections. Before starting demolition the contractor shall verify that all utilities have been disconnected. The contractor is responsible for calling dig safe to get locates. The sewer shall be capped. Demolish and remove the house and foundation. All demolition materials shall be dumped in a demolition landfill licensed by Kansas Department of Health and Environment. Demolition landfill receipts to show landfill usage is required prior to payment for services rendered. Remove concrete, bricks, buckets, totes, plastic chair, coolers, green metal post, satellite antenna, barbeque pit, both wooden handicap ramps, metal stair railing on concrete steps at front of property, limbs, branches and wood on ground, loose trash, debris and rubbish from the premises. Leave the concrete stairway and the rock retaining wall running along the front of the property and alley on North side of the property. Remove all interior sidewalks and concrete pads between the top of the concrete stairway and the back of the property. All trees, branches and limbs on the ground, incidental to the demolition of the structures. Trees can only be removed if affecting the demolition of the structure. (Include any tree removal necessary with the bid of the structure) **NOTE if a tree in the City ROW needs to be removed the contractor is responsible for contacting the Code Inspector prior to the removal of the tree. All grass/vegetation shall be cut back below the 12 inches to comply with the City of Topeka ordinance. The foundation hole shall be inspected to insure no demolition debris is in it prior to back filing of the excavation. The site shall be graded to drain away any standing water or drainage way and the ground shall be grass seed ready.