Specifications include, but are not limited to: 2. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas. B. Disposal: Remove waste materials from Owner's property and legally dispose of them A. General: Provide borrowed soil materials when enough satisfactory soil materials are not available from excavations. 1. Unsatisfactory soils include satisfactory soils not maintained within 2 percent of optimum moisture content at time of compaction. B. Engineered Fill: Naturally or artificially graded mixture of natural or crushed gravel, crushed stone, and natural or crushed sand; ASTM D 2940; with at least 90 percent passing a 1-1/2-inch (37.5-mm) sieve and not more than 12 percent passing a No. 200 (0.075-mm) sieve. C. Bedding Course: Naturally or artificially graded mixture of natural or crushed gravel, crushed stone, and natural or crushed sand; ASTM D 2940; except with 100 percent passing a 1-inch (25-mm) sieve and not more than 8 percent passing a No. 200 (0.075-mm) sieve. D. Drainage Course: Narrowly graded mixture of [washed ]crushed stone, or crushed or uncrushed gravel; ASTM D 448; coarse-aggregate grading Size 57; with 100 percent passing a 1-1/2-inch (37.5-mm) sieve and 0 to 5 percent passing a No. 8 (2.36-mm) sieve.