Specifications include, but are not limited to: 4.1.1. Furnish all labor, tools, equipment, materials, and incidentals to evaluate and replace existing HVAC in the Park Store at Garner State Park, to include mold remediation if necessary. 4.1.2. Jobsite must be cleaned daily so as not to disrupt employees or normal operations of affected area(s). 4.1.3. Upon completion of the work, area will be cleaned, and all debris accumulated will be removed from the jobsite. 4.1.4. Upon final acceptance of the work by TPWD, the Contractor shall furnish to TPWD the maximum available manufacturer’s warranty on all installed products. Material and labor on installation shall be warranted by Contractor for a period of one-year. 4.1.5. All work shall be performed within a scheduled timeframe mutually agreed between the Contractor and Park Superintendent.