Specifications include, but are not limited to: Contractor shall dry-dock the Medeia to complete the work items detailed in ITB 2300000XX. Contractor shall also provide power and gangway access to the Medeia while in dry-dock and dockside. The Contractor shall provide a fixed cost for all labor, material, and equipment to scrape (from waterline to bottom of keel) and pressure wash the entire exterior of the vessel from keel to the top of the wheelhouse. Disassemble and inspect the main sea chest valve (NIBCO 3” O.S.Y. valve). Replace: valve stem packing, disc rubbers, and all gaskets associated with valve. Valve interior should be painted with AP epoxy paint and spindle greased before reassembling. Disassemble and inspect the two (2) 1-1/4" bronze gate valves attached to sea chest (serving sanitation system supply and spare). Provide Owner Representative a written report of condition for the Sea Chest and Valves and any deficiencies noted.