Specifications include, but are not limited to: o Provide and install new motor, pump, and platform assembly in the pump room located at the City Park pool. This shall include all necessary plumbing modifications to make the system fully operational. If required by pump manufacturer, a concrete base may need to be poured to allow for proper installation. Add Alternate # 1 o Provide only a spare pump and motor that can be easily interchangeable with base bid pump. Add Alternate # 2 o Install two new motors, pumps, and platform assemblies that are plumbed into existing lines so that the pump assemblies can be switched from one pump to another. In this configuration a lock out device should be included so that both pumps cannot be running at the same time. Valves shall be installed so that pumps can be isolated. If required by pump manufacturer, concrete bases may need to be poured to allow for proper installation.