Specifications include, but are not limited to: Replacement and rehabilitation of curb, gutter, sidewalk, driveways and pavement rehabilitation. 1 92,016 SF Remove Plantmix Bituminous Pavement, complete and in place. $ /SF $ 2 92,016 SF Prepare Existing Aggregate Base Material - Balance, Scarify, Moisture Condition and Grade, complete and in place $ /SF $ 3 100 CY Overexcavation of Unsuitable Material, Furnish & Place Type 1 Aggregate Base, complete and in place (contingent item) $ /CY $ 4 4 EA Install Type 4-R Drainage Inlet, Including Storm Drain Lateral, complete and in place. $ /EA $ 5 92,016 SF Furnish & Place 4-Inch Plantmix Bituminous Pavement complete and in place. $ /SF $ 6 5,526 LF Remove Existing and Construct PCC Type 1 Curb and Gutter, complete and in place. $ /LF $ 7 9,308 SF Remove Existing and Construct PCC Residential Driveway Approach, complete and in place. $ /SF $ 8 11,468 SF Remove Existing and Construct PCC Sidewalk, complete and in place. $ /SF $ 9 14 EA Remove Existing and Construct PCC ADA Accessible Ramp, complete and in place. $ /EA $