Specifications include, but are not limited to: The improvements consist of furnishing all labor and materials for the rehabilitation of Bridge 2- 010A. The rehabilitation includes making repairs to the substructure and superstructure elements and applying a sealer to the existing barriers. Follow other incidental construction in accordance with the location, notes and details shown on the plans, and as directed by the Engineer. 1. The contractor shall employ measures during construction to prevent spills of fuels or lubricants. If a spill should occur, efforts shall be undertaken to prevent its entry into wetlands, aquatic, or drainage areas. Any spills entering wetlands, aquatic, or drainage areas shall be removed immediately. The Division of Water Resources (DNREC), Wetlands & Aquatic Protection Branch, 302-739-4691, shall be notified of any spill(s) within six (6) hours of their occurrence. That office will determine the effectiveness of spill and contamination removal and specify remediation efforts as necessary. 2. All construction debris, excavated material, brush, rocks, and refuse incidental to the work shall be placed either on shore above the influence of flood waters or on some suitable disposal site approved by the department. 3. The disposal of trees, brush, and other debris in any stream corridor, wetland surface water or any drainage ditch is prohibited.