Specifications include, but are not limited to: WRF VAC TruckP a g e |76.04Sub frame shall be designed to ASME standards for maximum applied loads, chassisframe movement and even distribution of weight to the chassis and suspension.6.05Sub frame shall be continuous and uninterrupted from back of cab to end of frame.7DEBRIS BODY7.01Efficiency of air movement through debris body will be measured for minimal restrictionas measured by vacuum pressure gauge while operating blower at full speed. Pressuredrop throughout entire system (from 8" hose inlet to blower inlet) including specifiedfiltration and blower protection devices shall be no greater than 3" hg as measured atblower.7.02The body shall be cylindrical having a minimum usable capacity of 10 cubic yards.7.03The body shall be capable of high dump height of 60". Dump height of 60" must beachieved without the use of scissor lift mechanism.7.04The debris storage body shall be constructed with a minimum 1/4" corrosion andabrasion resistant Ex-Ten steel.7.05The debris storage body shall have a minimum yield point of 50,000 PSI and a minimum tensile strength of 70,000 PSI.7.06Body shall have a rear door that is hinged at the top and is equipped with a replaceable neoprene type seal. Adjustable for periodic compensation of door seal wear.7.07Dual outward mounted rear door props shall be included as standard to preventoperator from entering door swing path when engaging rear door prop