Specifications include, but are not limited to: Section 01 COMMON ITEMS 1 025323 1.00 LS MOBILIZATION / 2 070626 1.00 LS MOBILIZATION (DBE) / 3 025358 1.00 LNFT $15.000 $15.00 LOOP DETECTOR REPLACEMENT (SET PRICE) / 4 070580 1.00 HOUR $65.000 $65.00 FLAGGER (SET PRICE) / 5 025324 1.00 LS TRAFFIC CONTROL / 6 025600 1.00 EACH FIELD OFFICE AND LABORATORY (TYPE A) / 7 020001 1.00 LS $4,000.000 $4,000.00 MAINTENANCE AND RESTORATION OF HAUL ROADS (SET PRICE) / NON-PART Section 01 Total $4,080.00 Section 02 ASPHALT SURFACING ITEMS 8 011372 5258.00 TON HMA-RCI (PG 70-28 RCI) / 9 060240 20958.00 TON HMA OVERLAY (SR-12.5A) (PG 76-22) / 10 060257 8554.00 TON HMA OVERLAY (SR-12.5A) (PG 64-22) (SHOULDER) / 11 081699 29512.00 TON QUALITY CONTROL TESTING (HMA) / 12 010819 31.00 TON EMULSIFIED ASPHALT (EMULSION BONDING LIQUID) / 13 010256 81.00 TON EMULSIFIED ASPHALT (SS-1HP) / 14 011764 39825.00 SQYD MILLING / 15 081050 981.00 TON PAVEMENT EDGE WEDGE (ROCK) / 16 011478 1.00 MGAL $35.000 $35.00 WATER (EARTHWORK COMPACTION) (SET PRICE) / 17 011750 1.00 EACH $45.000 $45.00 ASPHALT CORE (SET PRICE) / 18 000063 1.00 EACH $1.000 $1.00 ASPHALT AIR VOID PAY ADJUSTMENT / 19 000062 1.00 EACH $1.000 $1.00 ASPHALT DENSITY PAY ADJUSTMENT / 20 070916 145.10 STAL PAVEMENT MARKING (TEMP) 4" SOLID (TYPE I) / 21 070917 256.00 STAL PAVEMENT MARKING (TEMP) 4" SOLID (TYPE II) /