Specifications include, but are not limited to: Section 01 COMMON ITEMS 1 020100 1.00 LS CONTRACTOR CONSTRUCTION STAKING / 2 025602 1.00 EACH FIELD OFFICE AND LABORATORY (TYPE C) / 3 025323 1.00 LS MOBILIZATION / 4 070626 1.00 LS MOBILIZATION (DBE) / 5 012340 1.00 CUYD $40.000 $40.00 FOUNDATION STABILIZATION (SET PRICE) / 6 071554 1.00 CUYD $175.000 $175.00 CONCRETE FOR SEAL COURSE (SET PRICE) / 7 040707 1.00 LS CURING ENVIRONMENT / 8 025200 1.00 LS REMOVAL OF EXISTING STRUCTURES / 9 025324 1.00 LS TRAFFIC CONTROL / 10 070580 1.00 HOUR $25.000 $25.00 FLAGGER (SET PRICE) / Section 01 Total $240.00 Section 02 ROAD ITEMS 11 025361 1.00 LS CLEARING AND GRUBBING / 12 012410 1078.00 CUYD COMMON EXCAVATION (RURAL SMALL) / 13 012332 106.00 CUYD COMPACTION OF EARTHWORK (TYPE B) (MR-90) / 14 010114 1.00 MGAL $35.000 $35.00 WATER (GRADING) (SET PRICE) / 15 054602 2.00 EACH END SECTION ( 24") (CS) / 16 054552 2.00 EACH END SECTION ( 18") (CS) / 17 050779 85.00 LNFT ENTRANCE PIPE ( 24") (CSP) / 18 050579 48.00 LNFT ENTRANCE PIPE ( 18") (CSP) / 19 023447 157.00 LNFT GUARDRAIL, STEEL PLATE / 20 023411 3.00 EACH GUARDRAIL END TERMINAL (SKT) / 21 070296 1.00 EACH $140.000 $140.00 MAILBOX INSTALLATION (SET PRICE) /