Specifications include, but are not limited to: The Woodbridge School District is seeking the assistance of a professional Architectural and Engineering services firm experienced in K-12 education facilities renovations to complete an engineering study and financial cost estimates for renovations to the Woodbridge Middle School. The Woodbridge School District is looking for an Architectural and Engineering firm that will provide the Woodbridge School District Administration the following services: • Provide an architectural and engineering study and report detailing the scope of work and cost estimates for renovations to the Woodbridge Middle School. The report and cost estimates shall provide the Woodbridge School District with three (3) renovation options as follows: 1. Perform Architectural and Engineering study, project scope and cost estimates to remove all current steam boiler HVAC system, to include all current steam piping intermediate and terminus equipment, and replace with dual-temp heated and chilled water equipment, intermediate and terminus equipment capable of both heating and air conditioning (cooling); remove and replace all existing temperature controls with replace with new controls. This study, project scope and cost estimates must include the interface with existing non-steam HVAC systems within the building. 2. Perform Architectural and Engineering study, project scope and cost estimates to remove the current HVAC system entirely, and replace with a system capable of dehumidification, heated and chilled water system, to include all heating and chilling equipment, intermediate and terminus equipment capable of both heating and air conditioning (cooling); remove and replace all existing temperature controls with replace with new controls. 3. Perform a study of the building for a complete renovation to include all systems, rooms and structures. The study must include the removal and replacement or initial installation of all HVAC, electrical, mechanical and structural systems as well as life/health/safety systems. This study option is intended to bring the facility up to current codes and educational standards.