Specifications include, but are not limited to: 1.2 DEMOLITION AND RESTORATION WORKS The Contractor shall. • Demolish and remove all existing ductworks, pipe works, conduits, cables, and other accessories not necessary for the project. • Cut wall and floor openings for pipe/duct penetrations and embedment’s. • Fabricate and finish openings/penetration to acceptable state according to DFCS PM. 1.3 DESIGN • The Contractor shall ensure that the system operates in accordance with the design intent. 1.4 INSTALLATION OF AIR CONDITIONING EQUIPMENT • Check and verify equipment capacities, resistances in accordance to the design. • Install AC equipment. • Manage AC equipment installation and commissioning with supplier. 1.5 SUPPLY AND INSTALLATION OF AIR CON SYSTEM The Contractor shall supply, deliver, and install the following: • All equipment as necessary. • Supply air fans including electrical, control, acoustic box, hanger and supports, accessories. • Refrigerant pipe works including insulation, joints, trays/glands, hangers/supports and accessories necessary for a fully functional AC system. • Ductworks, volume control dampers, fire dampers, insulation, hangers and supports and related accessories to be included. • Condensate drainpipe works, insulation and accessories if required. • Equipment electrical works including power supply, controls, and accessories. • And other necessary items for a complete and fully functionally system.