Specifications include, but are not limited to: The work consists of the installation of underground conduit and street lighting in various locations throughout the City of Garden City. Conduit is installed normally in the range of 24”-60” per project specifications. There may be instances that the conduit is installed at a greater depth. Street Lighting poles or bases are installed by power installing machinery by digging the required hole size and depth or by the screw-in base, per project specification. All wiring, street light fixture installation, and handling of street lighting materials will be instructed to the Contractor by City Electric Department designated employees. Exposure to energized electrical infrastructure will be kept to a minimum for Contractor’s Employees by City Electric Department Personnel. All Contractors and Employees involved with the construction are required to attend a formal one-time yearly safety training by the City Electric Department before work is commenced. The contractor is responsible for all Employee PPE. The contractor is responsible for all One-Call location requests and follows proper spotting of buried infrastructure. Please include existing underground utility exposure in the per-unit bid to offset that exposure cost.