Specifications include, but are not limited to: Scope of Work and SpecificationsVerify system operation with existing hardware/software to ensure the system operatesper the published sequence of operation.Install any components and wiring necessary to support the hardware upgrade.Update the PLC, HMI hardware including the latest version of Windows softwarecompatible with the upgraded system.Verify communications and mapping is correct.Verify system sequences and load shares per the installed program utilizing load bank.Record system settings.Perform training as needed.There shall be no interface equipment items included or added without prior approval.The stated warranty period shall include parts and labor.