Specifications include, but are not limited to: The CONTRACTOR shall furnish all of the materials, labor, and perform all the work in the demolition of structures and appurtenance as follows: UTILITIES: 1. Disconnections: The City of Hot Springs will insure all utilities are removed before a demolition permit isissued. 2. Protection: The CONTRACTOR shall preserve, in operating condition, active utilities traversing the project site and shall protect property, including, but not limited to, valve boxes, poles, guys, and other appurtenances. The CONTRACTOR shall, to the satisfaction of the utility concerned, repair any damage to any such utility, which is due to work under this Contract. Unless otherwise directed all sidewalks, driveways (from sidewalk to street), and curbs shall be preserved. The contractor will repair all damage to sidewalks, curb cuts, and curbs. DEMOLITION, REMOVAL, AND CLEARING: 1. Except as otherwise provided herein, all buildings and structures including retaining and foundation walls, steps, piers, and other artificial objects and obstructions shall be completely razed and removed to a depth of at least one foot below ground level. 2. Wells, cisterns, cesspools, outdoor toilets, basements, cellars, septic tanks, etc., and holes and trenches resulting from demolition and removal shall be filled to the ground surface. Rock materials from masonry construction may be used in the backfilling up to a depth of one foot below the ground surface if sufficient fine materials are mixed therewith to fill the voids.