Specifications include, but are not limited to: Greenwood School District 50 would like to contract a company to demolish the existing softball backstop at GHS and provide and install a new backstop ; All fencing is to be removed dugout to dugout. It is the contractor’s responsibility to dispose of all materials correctly. The contractor needs to protect all pavement surrounding fencing. - 6-foot chain- link fencing needs to be added from dugout to dugout- approximately 128ft. The fencing needs to have black slats put in from dugout to dugout. - 2 wing poles need to be installed, one at each dug out. Pole need to be approximately 30 ft above ground. - Suspended netting (#36 Twisted Knot Netting) will need to be anchored from dugout poles and fencing to press box. This netting will provide coverage to the fans section.