Specifications include, but are not limited to: This is a TURN-Key project to include repair, replacement, installation, and state inspection. Vendor must supply one-price to include all work. • Repairs to a Cleaver Brooks Boiler model CB-200 – 500 HP SS #L90814 • Weld up to 8 cracks in the Morrison tube and replace 3 Tubes • To include the onsite visit from a state inspector to supply the required following: o A-1 for the nondestructive testing. o R-1 paperwork for the State & National Board. • Install throat and linear tile along with the baffle shelf in the rear door. • Boiler to be Hydro tested and reassembled for start-up. • Refractory requires one day bake out process. • Repairs to take place during normal working hours Mon – Friday 7:00 AM – 5:30 PM at Lee Correctional Institution located at 990 Wisacky Highway in Bishopville, SC 29010