Specifications include, but are not limited to: The Municipality of Skagway (MOS) desires to receive proposals from qualified bidders covering the furnishing of all materials, labor, and equipment necessary to design, permit, demolish, and refabricate an Ore Dock to be usable by ships over 1,000 feet long. It is anticipated that the Contractor may need to supply two pile installation Derrick Crane Barges and associated support barges to accomplish the project within the project schedule. Components of the Work include: • Demolition of existing timber dock to accommodate a temporary spud barge and access for work • Demolition of the existing ore loader superstructure (needed to accommodate larger ships) • Installation of two new dolphins at the north end of the ore dock • Relocation of catwalks to access the new dolphins • Reinforcement of two existing fender panels • Installation of piles at two existing dolphins for reinforcement • Installation of a temporary spud barge (up to approximately 110x35 feet) ‒ Installation of pile hoops onto the barge ‒ Installation of safety handrails on the barge ‒ Prep and installation of a concrete slab on the barge deck • Could be performed in Ketchikan where barge is moored, see plans. • Installation of gangway for pedestrian traffic from spud barge to an existing dock • Installation of a new bollards on existing ore loader support platforms • Reinforcement of a deep-water dolphin with (6) 36” diameter piles in 110’ + of water • Construction of a new dolphin in 150’ of water with (9) 36” diameter pile • Installation of new capstans at several locations and electrical required. ‒ Including electrical work to feed power to capstans • Pickup and delivery of MOS procured items in the Seattle area including: ‒ Piles, Fenders, and Capstans, Gangways • Underwater installation of anodes on dolphin piles (Add Alt Work)