Specifications include, but are not limited to: 1. Notify Project Coordinator (PC) within 24 hours of plugging commencement. 2. Move in equipment and rig up to the well. 3. Trip in hole (TIH), check total depth (TD) @ or below 1700, pull all tubing and packer found in the well. If estimated depth cannot be reached, begin cleaning out hole to approved depth / TD by PC. 4. Once TD has been reached / approved by PC, a bond log will be run inside the 6 ⅝” casing to determine casing depth and cement bonding location. 5. TIH to estimated TD @ 1700’ or inspector-approved depth with tubing, spot 6% gel and pump bottom hole cement plug from 1700’ to 1400’ then trip out hole (TOH). Wait on cement (WOC), then tag top of cement plug. Add cement if needed. 6. TIH free-point 6 ⅝” casing and attempt to pull. TIH with tubing and spot gel from 1400’ to 1060’ followed by 100’ cement plug from 1060’ to 960’. WOC, tag top of plug and add cement if needed. 7. TIH with tubing and spot gel from 960’ to 700’ followed by 100’ cement plug from 700’ to 600’. WOC, tag top of plug and add cement if needed. 8. TIH with tubing and spot gel from 600’ to 350’ followed by cement plug from 350’ to surface. WOC, add cement if needed. 9. Rig down and set monument. Reclaim site.