Specifications include, but are not limited to: 1. Contractor shall supply a 50-amp 120/240 volt, single phase electrical feed to the Conex box in the secured parking lot. 2. Contractor shall provide a 50-amp breaker for service to the Conex box (if needed). 3. Contractor shall provide the electrical feed to originate from the designated panel in main building electrical room, or new sub-panel as required. 4. Contractor shall run 1" conduit with three (3) #4AWG wire and one (1) #8AWG ground. Actual footage to be determined at bid walk. 5. Contractor shall trench as needed from the electrical room to the Conex box. Actual footage to be determined at the bid walk. 6. Contractor shall install a traffic rated utility box for access if needed at a later date. Exact location to be determined at bid walk. 7. Contractor shall install two (2) extra 1" conduits in the trench, one terminating at the newly installed traffic rated utility box. One will continue through to the interior of the Conex box as a spare if needed at a later date. 8. Contractor shall install a ground rod for the Conex box according to code. 9. Contractor shall back-fill, compact, and replace any concrete or asphalt removed during trenching. Asphalt joints and surfaces in area of excavation shall be sealed after installation. 10.Contractor shall remove all debris and packing material from the job site daily