Specifications include, but are not limited to: This project consists of the development of contract plans and related documents, geotechnical services, and possible additional surveying for the replacement of the Mabscott Overhead Bridge (#41-16-16.34) and the Cova Street Overhead Bridge (#41-16-16.49) at their existing locations and permanently shutting down an existing West Virginia Route (WV) 16 ramp between the two bridges. These structures are on a section of roadway that carries WV 16 over Whitestick Creek, railroad tracks, WV 16 entrance/exit ramps, Frontier Street, and Cova Street, and are located approximately 0.6 mile northeast of the West Virginia Turnpike (I-64/I-77). A Design Study has been completed and will not be a part of these services. Based on the information collected, it is recommended that traffic will be maintained on the existing bridge during construction, utilizing Case E-12 from the Manual on Temporary Traffic Control for Streets and Highways (2006 Edition)