Specifications include, but are not limited to: Installation of 24 LED lights; The work will be conducted in coordination with MSU Sports Facilities to provide the least possible interference to the activities of the Owner's personnel and activities. The work must be performed when there are no scheduled activities in the Brick Breeden Fieldhouse Arena and no activities below the work zone. Contractor must coordinate with MSU Sports Facilities to appropriately restrict access to the arena and area below the work zone. Work on this contract is expected to be done during regular working hours Monday through Friday. Any variation from this will require prior approval of the Consultant and Owner. Coordination: Coordinate construction activities included under various sections of these specifications to assure efficient and orderly installation of each part of the work. Coordinate construction operations included under different sections of the specifications that are dependent upon each other for proper installation, connection, and operation. a. Provide access to work at all times for inspections by Owner and authorized representatives. b. Provide safe working conditions and protection of completed work. c. Provide barricades and signs. d. Where installation of one part of the work is dependent on installation of other components, either before or after its own installation, schedule construction activities in the sequence required to obtain the best results. e. Where availability of space is limited, coordinate installation of different components to assure maximum accessibility for required maintenance, service and repair. f. Make adequate provisions to accommodate items scheduled for later installation. g. Where necessary, prepare memoranda for distribution to each party involved outlining special procedures required for coordination. Include such items as required notices, reports, and attendance at meetings.