Specifications include, but are not limited to: 201.0100 Clearing and Grubbing 2 AC $ $ 203.0100 Roadway Excavation 4,400 CY $ $ 209.0100 Installation, Maintenance, Monitoring, and Removal of BMP LS LS LS $ 209.0200 Additional Water Pollution, Dust, and Erosion Control FA FA FA $ 250,000.00 301.0100 Hot Mix Asphalt Base Course 1,000 TN $ $ 305.0100 Aggregate Subbase 1,200 CY $ $ 401.0410 PMA Pavement, Mix No. IV 750 TN $ $ 401.9000 Pavement Smoothness Incentive Allow Allow Allow $ 414.0110 Excavation of Weakened Pavement Areas 1,200 CY $ $ 415.0110 Cold Planing of Existing Pavement 29,000 SY $ $ 603.0100 Clean Existing Culverts FA FA FA $ 60,000.00 606.2000 31’’ W-Beam Guardrail with Standard 8’’ Offset Block, Steel 6-Ft Posts 5,000 LF $ $ 606.2008 31’’ W-Beam Guardrail with Standard 8’’ Offset Block, Steel 8-Ft Posts, Double Nested 315 LF $ $ 606.5000 Terminal Section, MSKT-SP-MGS, SoftStop, Max Tension or Approved Equal 20 EA $ $